Tiger Motors Lean Education Center

Auburn University · Industrial & Systems Engineering

Experience Lean Manufacturing.Explore the System.Improve the Process.

An immersive digital learning environment developed at Auburn University to extend experiential Lean Manufacturing education beyond the physical laboratory.

Go to Lean Training Earn a certificate
when you finish
Explore the Lab Testimonials

Companies and partners that train with us

Organizations whose teams have trained in Lean Manufacturing with Tiger Motors, in our lab and through our online platform.

Partners

Companies and partners that train with us

The facility

A Manufacturing System Built for Learning

Auburn University's Industrial and Systems Engineering department has developed a 4,000-square-foot Integrated Manufacturing Facility that simulates real-world automotive production environments. It gives students experiential learning opportunities in high-volume manufacturing settings like those used by Toyota and Honda.

This is where the Lean Systems class is taught. The digital platform extends access to that experiential environment beyond the physical laboratory, so the system can be studied, explored and revisited from anywhere.

4,000 sq ftIntegrated Manufacturing Facility
High-VolumeSimulates real-world automotive production environments
Hands-onLean Systems class taught inside the laboratory
NSF IUSESupported by the NSF IUSE: EDU Program

Enter the Tiger Motors Lab

Three ways to get to know the lab, in order.

1

The plant layout

Start with the map. Switch between two views: how the product and material moves from cell to cell, and how kanban cards carry the information that tells each cell what to build.

Tiger Motors Lab in 3DExplore in 3D

Material flows from Cell 1 to Cell 2 to Cell 3

Swipe sideways to see the whole plan

AS/RS Raw Stock Cell 3 3 Cell 1 1 Cell 2 2 MATERIAL DELIVERY to Cell 1 to Cell 2 to Cell 3 CNC 1 CNC 2 CNC 3 CNC 4 CNC 5 3D War Eagle Inc. Manufacturing Cell Tier 1 JIT Supplier SUPERMKT SUPERMKT SMED FGFinished goods 123456789101112131415 HEIJUNKA BOX 2-binreplenishment Pacemaker process PLC / Computer Lab Tool Area Storage Tiger Motors · Assembly Plant
Heijunka box

Cards leave the Heijunka box and go to station 11, the pacemaker process, in packs of 7 cards.

Supermarket 2

Station 11 pulls a car from Supermarket 2. This reveals a kanban card, which is sent to station 6.

Supermarket 1

Station 6 grabs a car from Supermarket 1. This reveals a kanban card, which is posted at station 1.

Special order

War Eagle Inc. makes the special part and delivers it just in time to station 15.

Replenishment

Cell 1 sends a card to Raw Stock and the AS/RS. The green card brings material back.

JIT delivery point
AS/RS: Automated Storage and Retrieval SystemSMED: Single-Minute Exchange of DieSupermarket: the buffer inventory between cellsAS/RS feeds raw stock · Raw Stock delivers material to Cells 1, 2 and 3 · product flows Cell 1 → Cell 2 → Cell 3
2

Walk the facility

Now step inside. Move through the same three cells in an interactive 360° tour.

360° LAB TOUR NESW

Lean Tour of the Tiger Motors Lab

Step inside the Integrated Manufacturing Facility and move through the production system in an interactive 360° environment.

Launch the Lab Tour
3

See it running

Watch students run the full production system in a 360° video.

YouTubeWatch our students work in the lab

A 360° video of students running the production system.

The Lean House Training

Follow the system from people to continuous improvement. Select an element of the house, in sequence, to open its learning materials.

Tap a part of the house to see its materials

CUSTOMER SATISFACTION MODULE 3 JIDOKA PILLAR MODULE 5 PDCA CONTINUOUS IMPROVEMENT KAIZEN MODULE 4 JUST IN TIME PILLAR MODULE 2 STANDARDIZATION MODULE 1 PEOPLE

Advancing manufacturing education through hands-on Lean

This project, supported by the NSF IUSE: EDU Program, aims to enhance STEM education and serve national interests by advancing manufacturing education through hands-on, evidence-based teaching in a Lean Manufacturing-focused laboratory course.

Project leads: Tom Devall · Jorge Valenzuela · Chih-hsuan Wang

Improving Undergraduate STEM Education

Supported by the U.S. National Science Foundation IUSE: EDU Program.

Jorge Valenzuela, Tom Devall and Chih-hsuan Wang holding model cars in the Tiger Motors lab
NSF grant · Tiger Motors labJorge Valenzuela, Tom Devall and Chih-hsuan Wang

In the news

More news

Stories about the Lean team and the project

The Lean Team

A team of educators at Auburn University teaching the Lean Systems class in a laboratory that simulates high-volume automotive manufacturing environments.

Project leads & team

Tom Devall

Tom Devall

Tiger Motors Lab Director · Program Director

Industrial & Systems Engineering

Jorge Valenzuela

Jorge Valenzuela

Philpott-WestPoint Stevens Professor of Industrial and Systems Engineering

Industrial & Systems Engineering

Diego Caputo

Diego Caputo

Lean Systems Expert
Digital Environment Architect & Developer

Industrial & Systems Engineering

Gonzalo Gil

Gonzalo Gil

Lean Systems Expert
Digital Environment Architect & Developer

Industrial & Systems Engineering

LinkedIn

Get in touch with the Lean Team

Lean Team

Lean Manufacturing Team

Office
Shelby Center, Auburn University
345 W Magnolia Ave, Auburn, AL 36849
Lab location
0317 Shelby Center
Lab Director

Dr. Tom Devall

Biography

Opening 360° experience